A grid-connected rooftop system in Thailand needs approval from several authorities. An experienced contractor should handle all of it for you.
Who is involved
- MEA or PEA for the interconnection application and meter change
- The Energy Regulatory Commission (ERC) for generation registration or notification
- The local authority for building modification, where the works fall under building control law
Documents usually requested
- Installation drawings and a single line diagram
- Roof structural load calculations
- Certification by a licensed engineer
- Panel and inverter specifications and standards certificates
- Property title and owner identification documents
Realistic timeline
In practice the paperwork takes longer than the installation. A typical house is installed in one to three days, while approvals and the meter change can run for several weeks. Start the documentation when the contract is signed.
On every ON Power All project we handle the full submission. You only need to supply your identification and property documents.
More articles

20 August 2026
How high does your bill need to be before solar pays off?
The answer is not just the bill amount. What matters most is how much you consume during daylight.
Learn more
13 August 2026
On-grid, hybrid or off-grid: which system should you choose?
The three system types differ in how they handle surplus power and outages, and that drives the price.
Learn more
30 July 2026
Which roof types work for solar, and which need care
Almost every roof can take panels, but the fixing method and leak risk differ considerably.
Learn more